Nonsense Watch UK All articles
Local Government

Have Your Say (It Won't Change Anything): The Glorious Charade of the British Public Consultation

Nonsense Watch UK
Have Your Say (It Won't Change Anything): The Glorious Charade of the British Public Consultation

The leaflet was cheerful. Lime green, with a speech bubble graphic and the words 'YOUR COMMUNITY, YOUR VOICE' in a font that said: we are approachable, we are listening, we have commissioned this from a design agency in Birmingham for £4,200. It had been posted through approximately 11,000 letterboxes in the borough, inviting residents to share their views on the proposed redevelopment of a car park into what the council was calling a 'mixed-use urban wellbeing quarter.'

The consultation period was six weeks. The response rate was, by the council's own admission, 'encouraging.' This meant 34 people had completed the online survey and three had attended the drop-in session at the leisure centre, where they were offered tea, a scale model of the development, and the quiet, unspoken understanding that none of this would make any difference.

The planning application had already been submitted.

The Anatomy of a Consultation

Britain's love affair with the public consultation is one of the more baffling features of our civic landscape. It is not that consultation is inherently absurd — in principle, asking people what they think before doing things to them seems eminently reasonable. The problem is that the British public consultation, as currently practised, has become almost entirely ceremonial: a ritual of democratic theatre in which the props are real but the play is fixed.

The process follows a reliable arc. First, a decision is made — by a committee, a board, a director of something, a ministerial working group — usually over a period of months involving detailed analysis, legal advice, contractor briefings, and, quite often, a pilot scheme that has already quietly begun. Then, the consultation is launched, because legislation requires it, or because the organisation's communications team has advised that 'community engagement' will help manage reputational risk.

The consultation is open for six to twelve weeks. It involves an online survey, a PDF of background documents that runs to 140 pages, and at least one 'engagement event' at a time convenient for nobody with a job. Responses are collected, collated, and summarised in a report that notes the 'breadth of views received' before explaining, in careful language, why the original plan remains the best approach.

The decision that was made in February is announced in September. A press release thanks residents for their engagement.

Who Responds, and Why

The three categories of people who actually complete public consultations are well established, and they deserve our respect, if not our sympathy.

First: the Professionally Concerned. These are the residents who respond to every consultation, on every topic, at every level of government. They are thorough, they are articulate, and they have strong views about bus shelters. Their submissions run to several pages. They cite precedent. They have bookmarked the council's planning portal. They are, in many ways, the backbone of local democracy, and their recommendations are almost never implemented.

Second: the Specifically Aggrieved. These are ordinary people who would not normally engage with a public consultation but have been roused by something that directly affects them — a proposed development near their house, a change to bin collection days, the closure of a particular leisure facility. Their responses are passionate, sometimes emotional, occasionally handwritten and delivered in person. They are counted, noted, and thanked for their contribution.

Third: the Accidentally Engaged. These are people who clicked a link on Facebook, thought the survey would take two minutes (it takes fourteen), and got halfway through before abandoning it at question seven, which asks them to rate their level of agreement with the statement: 'The proposed development aligns with the borough's strategic vision for sustainable growth.' They click 'neither agree nor disagree' on everything and submit. Their data is included.

The Language of Managed Expectations

Public consultations have developed a rich vocabulary for communicating, as gently as possible, that your input has been received and will be set aside.

'We have carefully considered all responses' means: we have read a summary produced by an officer who read a different summary.

'The consultation revealed a range of views' means: people disagreed with each other, which has allowed us to proceed as planned on the grounds that there was no consensus.

'Respondents raised a number of important themes' means: people said things. Some of those things will be mentioned in the final report, adjacent to explanations of why they do not alter the outcome.

'We will continue to engage with the community throughout the delivery phase' means: there will be another drop-in event when the construction starts and people complain about the noise.

The Drop-In Session: A Vignette

It is a Wednesday afternoon in a sports hall. Three members of council staff stand behind a trestle table bearing rolled-up maps, a scale model under a perspex cover, and a plate of biscuits that is doing most of the heavy lifting in terms of attendance.

A man in his sixties arrives and examines the scale model for eleven minutes without speaking. He then asks a detailed question about drainage. The council officer answers carefully, using the phrase 'that's a great question' as a buffer while she works out whether she knows the answer. She does not, entirely, but commits to 'following up.'

A woman with a pushchair arrives, completes a feedback form in three minutes, takes two biscuits, and leaves.

A local journalist arrives, takes a photograph of the scale model, and asks if there is a quote available. There is a quote available. It was prepared last week.

At 4.47pm, thirteen minutes before the session closes, nobody else comes. The staff pack up the maps. The scale model goes back in its box. The remaining biscuits are distributed among the team. It has been, the lead officer will write in her notes, 'a productive engagement session with good community representation.'

The Verdict Nobody Asked For

There is something almost admirable about the public consultation — not for what it achieves, but for the sheer commitment to the performance. The leaflets, the surveys, the drop-in sessions, the 140-page background documents: all of it exists to honour the idea that public decisions should involve the public, even when the mechanisms for doing so have been so thoroughly hollowed out that they now serve primarily to document the absence of genuine participation.

The consultation will close on the 14th. The report will be published in March. The development will proceed as planned. The car park will become a mixed-use urban wellbeing quarter, and in five years, residents will have largely forgotten it was ever a car park.

And somewhere, a lime green leaflet with a speech bubble on it will flutter into a recycling bin, its mission accomplished, its promise kept in the only way it was ever meant to be kept: technically, and not at all.

All articles

Related Articles

New Logo, Same Potholes: The Great British Public Sector Rebrand Racket

New Logo, Same Potholes: The Great British Public Sector Rebrand Racket

Somewhere Between Nowheresville and 'Innovation Nexus': Britain's Place Rebranding Gold Rush

Somewhere Between Nowheresville and 'Innovation Nexus': Britain's Place Rebranding Gold Rush

The Hub Delusion: Why Every British Public Building Now Sounds Like a Space Station

The Hub Delusion: Why Every British Public Building Now Sounds Like a Space Station